Buy the forest here.
The forest scaffolding to get logs to 2nd floor.
Logs are affected by the game physics and may be pushed around when walking or placed in a.
We use a simple ratchet strap to hold the logs in place.
Requested video this is how you build a second floor in the forest.
Custom floors can be placed manually but are easiest when done auto however you ll want to do it in single player then or attempt to convince it to make a hole by building your walls in such a way that it will leaving certain parts open and shaping the walls so the floor won t cover your stairs.
Wide scaffolding needs to be tied in when it exceeds 15 ft.
Click on the second picture to see the eyebolts and ratchet strap.
Place the log cabin on a slope and procedural platform will be constructed underneath to give it support.
The top 2 pictures are a dray i threw together for about 10.
The axe the yacht is supplied with an axe that chops wood down faster than the others but this yacht is sometimes guarded by sharks every location in the forest is randomly placed.
In this video of the forest i make the ultimate scaffold tower that only costs 36 logs compared to the 300 that the tower costs.
A player may carry a maximum of 2 logs at a time or two logs and one corpse.
It is also 2 5 times talle.
Log cabin now has a floor a door with hinge and a sleeping saving spot birds will now land on window ledge of your built log cabin v0 01b.
Basically we have been building a base looks like a house and have used basic walls stacked more basic walls on top.
No more cabins on side of hills.
Nothing wants to clip and make a floor thanks.
Then craft with cloth to upgrade it once.
V0 53c check out my channel for more videos like this.
When a tree is chopped down it falls to the ground and then 4 5 logs are created they can get launched into the air due to the physics collisions with objects on the ground.
We won t cover scaffold tie ins in this article.
And the axe once aquired.
It really works slick hauling logs and works either in snow or on bare ground.
Ask your scaffold rental specialist for specifics on tie ins if necessary.
Once the height exceeds three times the minimum width of the tower you must tie the scaffolding to the building at specific intervals.
The map stays the same on the yacht youll recieve a picture of the abominations down in the caves alot of rope.
The trailer is an atv trailer and we also use this behind our cub cadet.
No not the plane axe.
Now the issue is creating a roof or floor so we can have a second floor third floor etc.